Home/Projects

Megawatts delivered.Landscapes transformed.

Historical projects executed and managed by our promoter team under the banner of ME Developers — contributing significantly to South India’s renewable energy grid.

Portfolio

Key projects executed & managed

Filter by technology to explore our solar, wind and land acquisition experience.

Actual site photoGenuine photograph from the project siteRepresentative imageNot from this projectIllustrationGraphic, not a photograph

Developer names are shown as the historical execution track record of the Thummala Energy promoter team under the ME Developers banner, and do not imply endorsement. Images marked “Representative image” or “Illustration” are not photographs of the listed project.

Capacity at a Glance

Portfolio by capacity

Over 610 MW of solar and wind capacity executed and managed by our leadership, plus 2,500+ acres of land acquired for solar and wind developers.

330MW
Solar executed
280MW
Wind executed
Shiridi Sai Solar ParkSolar · N.P. Kunta
300 MW
BC JindalWind · Ballari
100 MW
Axis EnergyWind · Kurnool
75 MW
ReNew PowerWind · Paravelli
75 MW
ReNew PowerWind · Kudligi
30 MW
Ray ForgeSolar · Tadipatri
30 MW
Case Study · Ray Forge Solar, Boppepalli

From bare land to an energised plant.

A step-by-step look at how our teams take a solar plant from bare land to an energised switchyard.

Surveyor setting out with total station
Step 01

Survey & Pile Marking

Precise pile foundation locations are marked using GPS and total-station equipment based on detailed engineering plans — critical for the structural integrity and performance of the entire installation.

Column posts set on pile foundations
Step 02

Pile Augering & Column Posts

Tractor-mounted augers drill foundation holes, followed by column posts set to exact levels to support the module mounting system.

Module fixing on structures
Step 03

Module Fixing

Solar modules are mounted, aligned and fastened by trained crews under engineer supervision, with quality checks at every table.

Cable trench with conduit
Step 04

Cable Laying

Cables are routed through conduits and trenches at the correct depth, laid parallel, protected from moisture and UV, and route-marked for future maintenance.

LT and HT panels under shed
Step 05

LT & HT Panels

Low- and high-tension panels are installed, wired and tested to safely collect and step up the plant’s generation.

Crane lifting a three-phase transformer
Step 06

Three-Phase Transformer

Heavy-lift cranes position the transformer on its plinth, complete with fire-protection systems and fencing.

Switchyard structure
Step 07

Switchyard

The switchyard is erected and commissioned for reliable power evacuation to the grid.

SCADA control room setup
Step 08

Control Room & SCADA

A purpose-built control centre with SCADA lets operators monitor and control the plant, with redundant power, HVAC and integrated communications.

Lined storm-water drain beside solar array
Step 09

Drains & Roads

Storm-water drains, stone pitching and gravel roads protect the plant and keep it accessible in every season.

Your project could be next.

Let’s discuss capacity, land and timelines for your solar or wind plant.